Rationale II
4. DoD investment required to sustain Ada advantage
5. Ada installed base a liability without support
- Ada vendors can't do it alone
- $15M/year at the margin makes a big difference
- Enhances DoD warfighting software capability
6. Weak Ada waiver process best strengthened by integration with software-engineering best practices Architecture review boards
- Investment repaid by savings on installed base
PREVIOUS | CONTENTS | NEXT |